You don't have javascript enabled. Good luck with that.
Pencarian
Sisa Kompensasi Simpang Susun Semanggi Digunakan Bangun Trotoar

Remaining Compensation of Semanggi Interchange Used for Repairing Sidewalk

Jakarta Provincial Government is about to use the remaining compensation of the increase in build floor coefficient (KLB) from the Semanggi Interchange developer to repair the sidewalk.

Because there is development efficiency of Semanggi Interchange thus there is money left. The rest we will use to build pedestrian

City Secretary, Saefullah disclosed, compensation from the Semanggi Interchange developer over the increase in KLB by Rp 579 billion. Most of compensation has been used to support Semanggi Interchange amounting to Rp 360 billion.

Artistic Lighting to Brighten Up Semanggi Interchange

"Because there is development efficiency of Semanggi Interchange thus there is money left. The rest we will use to build pedestrian," he said, at City Hall, Wednesday (7/26).

He mentions the two sidewalks that will be repaired through KLB compensation fund are approximately 3.5 kilometers. As planned, these sidewalks are located on Jalan Jenderal Sudirman, from Patung Pemuda until Bendungan Hilir (Krukut River) as long as 2 kilometers. Another sidewalk is located on Jalan Gatot Subroto, from Kartika Chandra Hotel until Ria Senayan Park as long as 1.5 kilometers. 

"This is so amazing, from the efficiency of Semanggi Interchange, we can use it for other activities. The sidewalks will be completed with ducting. Thus all the installation of utilities is expected not to damage the repaired sidewalk," he said.

Jakarta Bina Marga Dept. Head, Yusmada Faizal uttered, sidewalk has nine meters on both sides of the road.

"It will be realized in the near future. It's targeted to be executed prior to 2018 Asian Games," he closed.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye737 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye614 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye524 personFakhrizal Fakhri
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye500 personAnita Karyati