You don't have javascript enabled. Good luck with that.
Pencarian
e-ticket transjakarta istimewa

PT Transjakarta to Implement Integrated Electronic Ticket

The plan to implement TransJakarta bus electronic ticket (e-ticket) will be realized this year. Later, TransJakarta bus ticket will be integrated with other transportation modes, such as Commuter Line (CL) and Mass Rapid Transit (MRT).

Use e-ticket for transactio

PT Transjakarta President Director, Antonius Kosasih, stated that PT KAI President Director has agreed with this plan. However, the implementation will be done gradually in which the manual payment still can be accepted until the end of this year. And starting January 2015, TransJakarta bus will no longer accept ticket payment in cash.

“Use e-ticket for transaction,” he said at City Hall, Monday (6/16).

TransJakarta Bus e-Ticketing Users still Low

The implementation of TransJakarta bus e-ticket integration will be prioritized in two parts. Part one is Cawang Station, Pasar Minggu TransJakarta Bus Stop, and Jatinegara TransJakarta Bus Stop. Meanwhile, the second part is Manggarai Station, Juanda TransJakarta Bus Stop, and Sudirman TransJakarta Bus Stop.

According to Kosasih, this plan still needs to be coordinated with the Bank of Indonesia (BI) since the e-ticket is considered as an amount of money saved in a card.

“Because of that, there should be permission from BI. That’s what we’ll coordinate,” he uttered.

To get TransJakarta bus e-ticket, passengers only need to top up in determined banks or integrated stations. This e-ticket procurement aims to avoid undesirable things and prevent financial leakage.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1589 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1303 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye844 personAldi Geri Lumban Tobing