You don't have javascript enabled. Good luck with that.
Pencarian
Ujicoba ERP Akan di Laksanakan Pertengahan Juli 2014

ERP System Tested Out This Mid-July

Perhaps, the Q-free company will test out the system in upcoming September. As for the Kapsch company can already install the system in form of gate and tool this week. Hopefully, it could be realized this July

Head of Jakarta Transportation Department, M Akbar, said two foreign companies, Q-free and Kapsch has stated interest in becoming an investor in the implementation of Electronic Road Pricing (ERP). From both companies, only the Kapsch company from Sweden is ready to test out the system on Jalan Jenderal Sudirman and Jalan MH Thamrin in mid-July 2014. 

While the Q-free company from Norway still needs three months ahead to test out the system 

38 ERP Gates Constructed in Sudirman-Kota Corridors

"Perhaps, the Q-free company will test out the system in upcoming September. As for the Kapsch company can already install the system in form of gate and tool this week. Hopefully, it could be realized this July," he stated, Tuesday (7/2).

ERP system is one of the city administration's step to overcome traffic congestion in the capital by reducing four-wheeled vehicle on some roads. The system will be implemented along Jalan Sudirman, from Panin Building or Ratu Plaza.

He disclosed that such system only has entrance gate and is different with toll road gate. "When passing the gate, we just pay electronically through the On Board Unit (OBU) in each vehicle," he explained.

In the trial, Akbar added, Transportation Department plans to install 50 OBUs for free on vehicles that pass on Jalan Sudirman or ERP gate.

"We provide the OBU for free. We just want to ensure whether the system can run well or not," he uttered.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye357 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye352 personAldi Geri Lumban Tobing
close