You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan MRT Jakarta Capai 95,97 Persen

Phase I MRT Development Reaches 95.97 Percent

Physical development is consisting of elevated station that has reached 94.42 percent, underground station has reached 97.53 percent, and depot and elevated section has reached 94.42 percent

The phase I MRT development that connects Lebak Bulus to HI Roundabout today, has reached 95.97 percent.

"Physical development is consisting of elevated station that has reached 94.42 percent, underground station has reached 97.53 percent, and depot and elevated section has reached 94.42 percent," disclosed MRT Jakarta President Director, William P Sabandar, Tuesday (8/28).

Anies Rides MRT Trains from Lebak Bulus towards HI

If it is calculated with operation time, his party still has 184 days to prepare for any shortcomings.

"Hopefully everything can run smoothly and well," he hoped.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5426 personBudhi Firmansyah Surapati
  2. Jakarta Provincial Government Receives a Grant of Rp 9.6 Billion in KPK`s Seized Assets

    access_time20-10-2026 remove_red_eye4583 personDessy Suciati
  3. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1777 personTiyo Surya Sakti
  4. Jakarta Pushed for Education Equity to Retain Top Student City Rank

    access_time19-10-2026 remove_red_eye998 personFakhrizal Fakhri
  5. Jakarta Esports 2026: Celebrating Local Games, Music and More

    access_time19-10-2026 remove_red_eye958 personAldi Geri Lumban Tobing