You don't have javascript enabled. Good luck with that.
Pencarian
Minimnya Mobil Tangga Penyebab Lambatnya Perbaikan Lampu PJU di Jakpus
Banyaknya lampu penerangan jalan umum (PJU) yang padam di beberapa wilayah di Jakarta Pusat. Suku Dinas Perindustrian dan Energi Jakarta Pusat membantah jika pihaknya lambat untuk memperbaiki , tetapi karena terbatasnya mobil operasio.
photo istimewa - Beritajakarta.id

Lack of Crane Car, Repair Work on Street Lights Unoptimal

We only have one crane car. If there are street lights as high as 13 meters, its repair must wait in line to be repaired

Lack of crane car has caused the Central Jakarta Industry and Energy Sub-Department cannot maximally repair the malfunctioned street lights. Currently, they only have one crane car to maintain and repair street lights in eight sub-districts.

"We only have one crane car. If there are street lights as high as 13 meters, its repair must wait in line to be repaired," said Head of Central Jakarta Industry and Energy Sub-Department, Iswandi, Wednesday (10/8).

1,000-Watt Street Lights Installed as Theft Prevention

According to Iswandi, the lack of crane car causes repair work does not optimal. "The proposal for additional crane car already done. Yet, the budget can be disbursed next year," he told.

He disclosed that the cause of malfunctioned street light is from technical malfunction, voltage factor, until non-technical factors such as missing or accidentally marred by irresponsible people.

Due to not having authority, he furthered he also had difficulty repairing the whole malfunctioned street lights in Central Jakarta. One example is on Jalan MH Thamrin and Jalan Sudirman which is the authority of Jakarta Industry and Energy Department.

"Repair work for street lights around two protocol roads is our authority," he stressed.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye349 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik