Seven Sluices Repair in Gg Kelor and Kampung Pulo Completed
Reported by Nurito | Translated by Nugroho Adibrata
Hopefully the sluice can function normally as before
The East Jakarta Water Resources (SDA) Sub-agency has repaired completed the seven sluice gates in Gg Kelor, Jalan Bunga I, RT 03/09 Palmeriam, Matraman and Kampung Pulo, Kampung Melayu, Jatinegara. It has been carried out since early June and is finished on Tuesday (6/22).
Flood Control Facilities, Clean Water and Waste Water Management Division Head Ikhwan Maulani said that repair was done due to damage in a number of parts and components.
Taman Dadap Merah Sluice Gate Development in Kebagusan Accelerated"Hopefully the sluice can function normally as before," he stated Tuesday (6/22).
He explained that its existence was very important, especially to accommodate flash flood from Bogor through Ciliwung River and Depok through Baru River.
"We also repaint them to make it look attractive," he told.
He added the two out of seven sluices at Gg Kelor had 5.2 meters height with 7.1 meters width that are divided into two doors.