You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Pintu Air di Gang Kelor dan Kampung Pulo Rampung
.
photo Nurito - Beritajakarta.id

Seven Sluices Repair in Gg Kelor and Kampung Pulo Completed

Hopefully the sluice can function normally as before

The East Jakarta Water Resources (SDA) Sub-agency has repaired completed the seven sluice gates in Gg Kelor, Jalan Bunga I, RT 03/09 Palmeriam, Matraman and Kampung Pulo, Kampung Melayu, Jatinegara. It has been carried out since early June and is finished on Tuesday (6/22).

Flood Control Facilities, Clean Water and Waste Water Management Division Head Ikhwan Maulani said that repair was done due to damage in a number of parts and components.

Taman Dadap Merah Sluice Gate Development in Kebagusan Accelerated

"Hopefully the sluice can function normally as before," he stated Tuesday (6/22).

He explained that its existence was very important, especially to accommodate flash flood from Bogor through Ciliwung River and Depok through Baru River.

"We also repaint them to make it look attractive," he told.

He added the two out of seven sluices at Gg Kelor had 5.2 meters height with 7.1 meters width that are divided into two doors.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye928 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye406 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye399 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye395 personFolmer