You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Saluran Air di Utan Kayu Selatan Disemprot Mobil Pemadam

Gulkarmat Personnel Clean Up Three Channels in Utan Kayu Selatan

East Jakarta Fire Handling and Rescue (Gulkarmat) Sub-agency personnel cleaned up three water channels on Utan Kayu Selatan Urban Village, Matraman, on Wednesday (10/7).

By spraying it with water, we hope it can make the water to flow well thus inundation can be minimized

East Jakarta Gulkarmat Sub-agency Fire Control and Rescue Section Head, Gatot Sulaeman mentioned, his side cleaned those channels because it was clogged due to mud sedimentation and waste.

His side cleaned the clogged channels by spraying the channels with water because personnel couldn't enter the channels.

Firefighters Dispatched to Clean Drain on Jalan Halim Perdana Kusuma

"By spraying it with water, we hope it can make the water to flow well thus inundation can be minimized," he stated.

This cleaning was carried out to follow up request from Utan Kayu Urban Village.

His side cleaned three water channels, consisting of water channel on Jl. Galur Sari Timur Gang Cikal RW 12, Jl. Kelapa Hijau RT 003, 006 of RW 014, and Jl. Nanas RT 006/012, Utan Kayu Selatan.

"We spray the channels using one unit of fire truck with capacity of 2.500 liters and deploy four personnel of East Jakarta Gulkarmat Sub-agency," he explained.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye866 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye799 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye773 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye626 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye466 personFolmer