You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Gorong-gorong Saluran Penghubung Kelapa Kopyor Rampung
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Box Culverts Dredging Work on Jalan Kelapa Kopyor Finally Completed

The North Jakarta Water Resources (SDA) has finally completed dredging of the Kelapa Kopyor connecting channel's box culverts from mud in Kelapa Gading Timur, Kelapa Gading.

We want to smoothen water flow in the culverts from Jalan Boulevard Raya

Kelap Gading Sub-district SDA Executing Unit Head Citrin Indriyanti said, it was carried out to maximize the function of the culverts.

"We want to smoothen water flow in the culverts from Jalan Boulevard Raya," she said, Sunday (12/27).

Joint Personnel Get Down and Dirty on Mass Cleanup along Jalan Raya Bogor

She explained, each culvert has about 20 meters long by 2.5 meters wide.

Similar action was also spotted on two other culverts along Jalan Kelapa Kopyor. They had 20 meters long with 2.2 meters wide and 12.5 meters long with 2.3 meters wide.

"Alhamdulillah the work is also completed already," he stated.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1519 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye941 personAldi Geri Lumban Tobing
  3. Gulkarmat to Intensify Fire Mitigation Education

    access_time22-01-2025 remove_red_eye449 personBudhi Firmansyah Surapati
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye423 personDessy Suciati
  5. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye412 personFolmer