You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Gorong-gorong Saluran Penghubung Kelapa Kopyor Rampung
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Box Culverts Dredging Work on Jalan Kelapa Kopyor Finally Completed

The North Jakarta Water Resources (SDA) has finally completed dredging of the Kelapa Kopyor connecting channel's box culverts from mud in Kelapa Gading Timur, Kelapa Gading.

We want to smoothen water flow in the culverts from Jalan Boulevard Raya

Kelap Gading Sub-district SDA Executing Unit Head Citrin Indriyanti said, it was carried out to maximize the function of the culverts.

"We want to smoothen water flow in the culverts from Jalan Boulevard Raya," she said, Sunday (12/27).

Joint Personnel Get Down and Dirty on Mass Cleanup along Jalan Raya Bogor

She explained, each culvert has about 20 meters long by 2.5 meters wide.

Similar action was also spotted on two other culverts along Jalan Kelapa Kopyor. They had 20 meters long with 2.2 meters wide and 12.5 meters long with 2.3 meters wide.

"Alhamdulillah the work is also completed already," he stated.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye415 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye398 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye355 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye325 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye317 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik