You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Gorong-gorong Saluran Penghubung Kelapa Kopyor Rampung
....
photo Budhi Firmansyah Surapati - Beritajakarta.id

Box Culverts Dredging Work on Jalan Kelapa Kopyor Finally Completed

The North Jakarta Water Resources (SDA) has finally completed dredging of the Kelapa Kopyor connecting channel's box culverts from mud in Kelapa Gading Timur, Kelapa Gading.

We want to smoothen water flow in the culverts from Jalan Boulevard Raya

Kelap Gading Sub-district SDA Executing Unit Head Citrin Indriyanti said, it was carried out to maximize the function of the culverts.

"We want to smoothen water flow in the culverts from Jalan Boulevard Raya," she said, Sunday (12/27).

Joint Personnel Get Down and Dirty on Mass Cleanup along Jalan Raya Bogor

She explained, each culvert has about 20 meters long by 2.5 meters wide.

Similar action was also spotted on two other culverts along Jalan Kelapa Kopyor. They had 20 meters long with 2.2 meters wide and 12.5 meters long with 2.3 meters wide.

"Alhamdulillah the work is also completed already," he stated.

Linked News
Popular News indeks
  1. Pramono Prioritizes Construction of Cakung Regional Hospital

    access_time18-04-2025 remove_red_eye468 personFakhrizal Fakhri
  2. Governor Pramono Joins Cycling in Jakarta Silaturahride 2025

    access_time19-04-2025 remove_red_eye408 personBudhi Firmansyah Surapati
  3. Jakarta to Make Public Transportation Free on April 24, 2025

    access_time18-04-2025 remove_red_eye319 personAldi Geri Lumban Tobing
  4. City Goverment Encourages Residents to Use Public Transportation

    access_time21-04-2025 remove_red_eye284 personFakhrizal Fakhri
  5. Transjakarta Applies Special Fares for Female Customers

    access_time20-04-2025 remove_red_eye263 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik