You don't have javascript enabled. Good luck with that.
Pencarian
Plt Walkot Jaksel Monitoring Kebakaran Pasar Impres
.
photo TP Moan Simanjuntak - Beritajakarta.id

Gongseng River Bridge Repaired

Repair work on Gongseng River Bridge which located at RW 06 and 07 of Cijantung Urban Village, East Jakarta which was carried out since March 28, has now been completed.

We dismantle the bridge and reinstall it in higher position

East Jakarta Bina Marga Sub-agency's Road and Bridge Section Head, Ilham Raya mentioned, bridge with length 8 meters and width 3.5 meters was repaired because its position was very low. Thus when it rains heavily, there is high water discharge and lot of garbage stuck in the bridge which causes water to overflow into residential areas.

Tanjung Barat and Lenteng Agung Flyovers Trial Period is Extended

"We dismantle the bridge and reinstall it in higher position. Thus residents can cross the bridge safely and comfortably," he explained, Tuesday (4/13).

Not only elevating the bridge, but his side also changed bridge's construction from concrete to iron and border plates.

"We deploy 10 Bina Marga Unit personnel every day," he added.

Cijantung Urban Village Head, Haerudin said, residents appreciated Bina Marga for repairing this bridge which connecting RW 06 and RW 07. Local residents put banner with size 4x1.5 meters on the bridge as their expression of gratitude to Bina Marga personnel and East Jakarta Government.

"Our residents are very grateful and appreciate personnel for finishing this bridge repair," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1221 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye911 personAldi Geri Lumban Tobing
  4. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye906 personDessy Suciati
  5. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer