You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakpus Intensifkan Pengerukan Enam Lokasi Aliran Kali

Central Jakarta SDA Intensifies Mud Dredging in 6 Locations

Currently, Central Jakarta Water Resources (SDA) Sub-agency is still intensifying mud dredging work in 6 rivers.

7 excavators are deployed to dredge mud from those 6 locations

Central Jakarta SDA Sub-agency's Maintenance Section Head, Achmad Daeroby stated, his side is currently dredging West Flood Canal from Karet Sluice Gate to Tubun KS, Sentiong River, from Johar Baru, Galur, to Police Station.

Then it continues to river flow on Jalan Kramat Raya to Paseban, Jalan Kramat Sawah XIII Paseban Urban Village, Utan Kayu River from Jalan Cempaka Mas to Sumur Batu, and tributary of Ciliwung River behind RSCM.

3,304 Meters Micro Channels Dredged in Grogol Petamburan

"7 excavators are deployed to dredge mud from those 6 locations," he mentioned, Friday (4/16).

His side also deployed 73 dump trucks with capacity of 5-22 cubic meters to transport mud sedimentation from those 6 locations.

Mud dredging work in 6 locations was carried out routinely as requested by local residents through Musrenbang forum.

"But trucks are difficult to access several dredging points, such as Sentiong and Utan Kayu Rivers," he conveyed.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1883 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye833 personDessy Suciati
  3. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye681 personDessy Suciati
  4. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye447 personDessy Suciati
  5. Jakarta Agrees on Rp79.59T Revised 2026 Budget Framework

    access_time21-08-2026 remove_red_eye428 personFakhrizal Fakhri