You don't have javascript enabled. Good luck with that.
Pencarian
Petugas SDA Lakukan Perawatan Tanggul Sepanjang Ratusan Meter di Pulau Untung Jawa
.
photo Suparni - Beritajakarta.id

Untung Jawa Island Breakwaters are Being under Maintenance

It is targeted to be complete by the end of this May

The Thousand Islands Water Resources (SDA) Sub-agency is conducting maintenance on breakwaters in Untung Jawa Island Urban Village, South Thousand Islands Sub-district, Thousand Islands.

Thousand Islands SDA Sub-agency Head, Hendri said the maintenance included patching the perforated breakwater surface and painting.

Collapsed Breakwater on East Side of Panggang Island Repaired

"It is focused on the Untung Jawa Island Main Pier as long as 224 meters and in the front of SDN 01 Pulau Untung Jawa as long as 142.8 meters and 1.23 meters width," he expressed, Thursday (5/27).

He explained it had been ongoing since May 26 and involved eight personnel.

"It is targeted to be complete by the end of this May," he stated.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye942 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye929 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye768 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye717 personBudhi Firmansyah Surapati