You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Baru di Jalan Panjang Cidodol Dikebut Atasi Genangan
....
photo Folmer - Beritajakarta.id

Channel Construction on Jalan Panjang Cidodol Accelerated

The South Jakarta Water Resources (SDA) Sub-agency continues to accelerate the construction of the water channels on Jalan Panjang Cidodol, Cipulir Urban Village, Kebayoran Lama Sub-district.

It is done to minimize puddles

Kebayoran Lama Sub-district SDA Executing Unit Head Andrian said that the construction was started from the red light on Jalan Panjang Cidodol which crosses Jalan H Amsar to Block C Lemigas Housing Complex.

"It is done to minimize puddles in front of the Naval Command and Staff School Building due to the hollow road," he expressed, Monday (3/14).

Revitalization Project at Panjang Island Religious Tourism Site Accelerated

His sub-agency has also coordinated with related units to handle high-voltage power cables, fiber optic cables, and relocation of hydrant pipes along channel lines built using box culverts.

"We have also proposed for a logging permit for 10 trees affected by the construction of channels to the PTSP office and are coordinating with the South Jakarta Parks and City Forest Sub-agency," he explained.

He went on to say that the total length of the channel to be built was 1,600 meters from the Cidodol Red Long light to Jalan Al Mubarok.

In the initial stage, the channel long that has been made is about 256 meters starting from the red light on Jalan Panjang Cidodol which crosses Jalan H Amsar or in front of the Lemigas Housing Complex.

"The workers dug the channel and installed the culvert very carefully due to the existence of high-voltage power lines and other utilities. We also deploy small backhoe equipment to optimize the dredging work," he added.

Kebayoran Lama Sub-district Head Iwan K Santoso added that his party was coordinating with RT/RW administrators to disseminate information to the Lemigas Housing Complex residents regarding the construction of channels to deal with inundation that often occurs in Cipulir area.

"I hope they understand the current condition of traffic congestion due to the ongoing construction of the channel," he stated.

Linked News
Popular News indeks
  1. Duren Sawit PTSP Holds Door-to-Door Servies at Pondok Kelapa TPU until Thursday

    access_time15-05-2024 remove_red_eye721 personNurito
  2. Commission D: RDF Construction in Rorotan Has Many Benefits

    access_time13-05-2024 remove_red_eye607 personFolmer
  3. Aiming to Global City, Jakarta Prioritizes the Development of Environmentally Friendly Waste Processing

    access_time13-05-2024 remove_red_eye587 personFolmer
  4. 35 Toddlers in Kedoya Selatan Received Assistance with Nutritious Additional Food

    access_time13-05-2024 remove_red_eye560 personTP Moan Simanjuntak
  5. 42,878 Tourists Swarm Monas Area

    access_time12-05-2024 remove_red_eye397 personBudhi Firmansyah Surapati