You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Marina di Jalan Pantai Indah Ditinggikan

Marina River Retaining Wall on Jalan Pantai Indah is Elevated

The Pademangan Sub-district Water Resources (SDA) Unit elevates the Marina River retaining wall on Jalan Pantai Indah, RW 10, Ancol, North Jakarta.

So far, the progress has reached 15 meters or 50 percent

Pademangan Sub-district SDA Unit Head Slamet Riyanto conveyed that the retaining wall was originally elevated as high as 30 centimeters and was increased by 55 centimeters to 85 centimeters.

It was carried out to prevent Marina River water from overflowing onto the road leading to the West Gate of Ancol Dreamland Park during heavy rains.

Jakarta Prepares Various Events to Celebrate its 495th Anniversary

"Usually, it causes inundation as high as 5-10 centimeters," he added, Monday (5/30).

Marina River retaining wall which was elevated had a length of 28 meters with a width of 30 centimeters for the top and 60 centimeters for the bottom part. The work has been carried out manually by involving 12 personnel since May 17, 2022.

"So far, the progress has reached 15 meters or 50 percent. It is targeted to be completed by mid-June," he explained.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1476 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1287 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1196 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1024 personFolmer
  5. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye945 personDessy Suciati