You don't have javascript enabled. Good luck with that.
Pencarian
Turap Kali Marina di Jalan Pantai Indah Ditinggikan

Marina River Retaining Wall on Jalan Pantai Indah is Elevated

The Pademangan Sub-district Water Resources (SDA) Unit elevates the Marina River retaining wall on Jalan Pantai Indah, RW 10, Ancol, North Jakarta.

So far, the progress has reached 15 meters or 50 percent

Pademangan Sub-district SDA Unit Head Slamet Riyanto conveyed that the retaining wall was originally elevated as high as 30 centimeters and was increased by 55 centimeters to 85 centimeters.

It was carried out to prevent Marina River water from overflowing onto the road leading to the West Gate of Ancol Dreamland Park during heavy rains.

Jakarta Prepares Various Events to Celebrate its 495th Anniversary

"Usually, it causes inundation as high as 5-10 centimeters," he added, Monday (5/30).

Marina River retaining wall which was elevated had a length of 28 meters with a width of 30 centimeters for the top and 60 centimeters for the bottom part. The work has been carried out manually by involving 12 personnel since May 17, 2022.

"So far, the progress has reached 15 meters or 50 percent. It is targeted to be completed by mid-June," he explained.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1300 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1131 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye842 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye297 personAldi Geri Lumban Tobing
  5. Travelers Departing from Lebak Bulus Terminal Starting to Increase

    access_time13-03-2026 remove_red_eye289 personTiyo Surya Sakti