You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Sky Bridge di Jalan Kebon Kacang Raya Dimatangkan

Sky Bridge Construction on Jalan Kebon Kacang Being Finalized

The Central Jakarta administration continues to finalize the sky bridge construction in the context of arranging Jalan Kebon Kacang Raya, Tanah Abang.

The sky bridge construction is the same as on Jalan Jati Baru

Central Jakarta Economic and Development Assistant, Bakwan Ferizan Ginting stated that conditions along Jalan Kebon Kacang Raya are currently very congested.

"Traders and buyers are crowded on the roads, thus motorcycle traffic is closed," he expressed, Thursday (11/3).

Construction of New Transjakarta Bus Shelter on Jl. Pemuda to Finish Soon

Therefore, traders along Jalan Kebon Kacang Raya would be arranged the same as on Jalan Jati Baru with the concept of a sky bridge.

"The sky bridge construction is the same as on Jalan Jati Baru. Traders will sell above, thus the Jalan Kebon Kacang Raya can again be crossed by motorcycles smoothly and safely," he explained.

He went on to say that his party collaborated with PT Integrasi Transit Jakarta (ITJ) for sky bridge design on Jalan Kebon Kacang Raya.

"The design is ready and will propose financing for the sky bridge construction using the developer's Space Utilization Principle Permit (IPPR) obligation," he continued.

His party was optimistic that the traders' arrangement on Jalan Kebon Kacang Raya would be resolved with the availability of sky bridge facilities.

"This is done thoroughly by providing a sky bridge facility to accommodate traders selling," he said.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1707 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1478 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1334 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1118 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye814 personDessy Suciati