You don't have javascript enabled. Good luck with that.
Pencarian
Jembatan, Antar Kampung, Pulo Gundul, Diperbaiki

Bridge Between Villages on Jalan Pulo Gundul Repaired

The Central Jakarta Bina Marga Sub-agency is seen repairing the bridge between villages on Jalan Pulo Gundul, Johar Baru.

It has been ongoing since two weeks and is targeted to be completed this week

Johar Baru Sub-district Bina Marga Executing Unit Head, Ika Dwi said the bridge between villages connected RW 10, Tanah Tinggi with RW 01, Johar Baru.

"This bridge has 20 meters long. The damage lies in its railing up to 15 meters," she expressed, Monday (7/10).

This Week, Marunda Bridge Repairs Completed

She explained the damaged bridge railing would be replaced with a new railing. The repair itself involved five workers from Johar Baru.

"It has been ongoing since two weeks and is targeted to be completed this week," she explained.

Aside that, the bridge would also be repainted black and yellow. Unfortunately, the repair was hampered by rainy weather, which made the process take a long time.

"It will take a long time. Moreover, the bridge railing must be welded as neatly as possible for long durability," she explained.

After it was done, locals could use the bridge safely and comfortably.

"Hopefully, I won't worry anymore when I cross the bridge," he hoped.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye877 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye801 personAldi Geri Lumban Tobing
  3. Rano: CIEIE 2026 to Catapult Jakarta’s MSMEs onto the International Stage

    access_time25-08-2026 remove_red_eye775 personBudhi Firmansyah Surapati
  4. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye627 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye468 personFolmer