You don't have javascript enabled. Good luck with that.
Pencarian
DKI Akan Bangun 2 Flyover di Atas Bundaran Semanggi

Parse Congestion, City to Build Flyovers Above Bundaran Semanggi

Jakarta Provincial Government (Pemprov) will build two flyovers above Bundaran Semanggi to provide alternative roads for vehicle passing from Jalan Senayan toward Cawang and from Grogol to Kebayoran Baru.

Yes, we still discuss about the design. We will manage Semanggi area in accordance with Mr. Governor’s plan

Jakarta Binamarga Department Head, Yusmada Faisal said, the project is still in planning process currently. "Yes, we still discuss about the design. We will manage Semanggi area in accordance with Mr. Governor’s plan," told Yusmada, Thursday (7/2).

Yusmada continued, later, the two flyovers will be built separating the lanes on Jalan Senayan-Cawang and Grogol-Kebayoran without passing on the road below which is usually jammed. "As example, the vehicle from Ratu Plaza toward Cawang can take a left turn to the flyover and go right directly to cawang," he explained.

Traffic Congestion to Shift During Ramadan

The project concept is intended to simplify the traffic at Semanggi area by making special access to turn right because the traffic is usually jammed due to the frequent meetings between two traffic flows at the area.

"The traffic jammed because the meeting of the vehicle that wants to go upwards from the bottom and from bottom to upwards. We will eliminate that condition by build this project," he uttered.

Yusmada added, his side still discuss about the Flyover basic design with Public Work Ministry (Kemen PU).

Linked News
Popular News indeks
  1. Jakarta Administration Steps Up Proactive Fire Prevention Efforts

    access_time09-10-2026 remove_red_eye397 personDessy Suciati
  2. 10,000 Participants Join People's Sports Festival at Velodrome

    access_time04-10-2026 remove_red_eye359 personNurito
  3. Public Health Alert, Jakarta Urged to Anticipate Influenza A Surge

    access_time07-10-2026 remove_red_eye331 personFakhrizal Fakhri
  4. Kelapa Gading-Pulogadung Link Road Targeted for Completion in 2027

    access_time09-10-2026 remove_red_eye316 personDessy Suciati
  5. Moving Day, Apuran River Locals Clear Out for New Flood Pump

    access_time09-10-2026 remove_red_eye314 personBudhi Firmansyah Surapati