You don't have javascript enabled. Good luck with that.
Pencarian
31 Ribu Jalan Reguler yang Rusak Mulai Dihotmik
.
photo Nurito - Beritajakarta.id

Regular Road Reparation Accelerated

The road reparation in the capital keep being accelerated. As recorded, along 31,000 square-meters of roads need to be repaired. Of the number, 20 percent have been done.

The reparation is conducted at night thus the road will be back to normal and ready to be passed by at noon

Head of Road Maintaining Division for Jakarta Bina Marga, Yudi Febriadi stated regular road reparation is targeted to be complete in November with budget amounted to Rp 38 billion.

The reparation is focused on upgrading road structure. To make it maximal, before the damaged road is repaired, it will be dredged until its foundation. Thus, when it is patched elevation the road will be as before.

5,800 Meters of Transjakarta Bus Lanes Repaired

"The reparation is conducted at night thus the road will be back to normal and ready to be passed by at noon," he stated, Tuesday (8/25).

It is conducted equal with quality of national roads. Some heavy equipments are also deployed in the reparation.

Based on Beritajakarta.com observation, those roads repaired are at Jalan KH Hasyim Ashari, Jalan Abdul Muis, and Jalan Majapahit from Jalan Abdul Muis junction until Harmoni.

"Whole road body is repaired using hotmix. Then continued on Jalan Kramat Raya starting from Kwitang junction until in front of Central Jakarta Resort Police," he explained.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye347 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik