You don't have javascript enabled. Good luck with that.
Pencarian
Ahok Pastikan Tidak Ada Negosiasi Lagi dengan PT JM

Basuki Halts Monorail Project

Jakarta Governor, Basuki “Ahok” T. Purnama ensured there is no negotiation with PT Jakarta Monorail (JM). It means the monorail project is stopped. Dozens of monorail poles will be used by PT Adhi Karya for Light Rapid Transit (LRT) construction.

There’s no bargaining

Basuki admitted that he has sent the letter to PT JM related the policy. Several requirements can not be fulfilled by the company.

“No more negotiation, I’ve told them about it,” he said at City Hall, Thursday (9/10).

City Wants Monorail Poles to Be Demolished

He added there are 15 requirements that the company cannot fulfill such as businesses plan, bank guarantee for five percent of the total monorail investment, displacement of depot construction from Setia Budi reservoir and Tanah Abang.

“There’s no bargaining,” he asserted.

As known, City Administration offers PT JM second chance to continue monorail project which been halted since 2007. The policy was taken in Joko “Jokowi” Widodo tenure. And they still cannot fulfil those requirements.

Linked News
Popular News indeks
  1. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye604 personAldi Geri Lumban Tobing
  2. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye563 personAldi Geri Lumban Tobing
  3. Pramono Confirms Permanent Bridge to Be Built in Tegal Alur

    access_time29-08-2026 remove_red_eye461 personDessy Suciati
  4. Jakarta Fine Arts and Ceramics Museum Hosts Malangan Exhibition

    access_time29-08-2026 remove_red_eye459 personFakhrizal Fakhri
  5. Pramono Emphasizes Importance of Creative Spaces for Children

    access_time03-09-2026 remove_red_eye435 personDessy Suciati