You don't have javascript enabled. Good luck with that.
Pencarian
Perlintasan KA Sebidang Pondok Kopi Mulai Ditutup
.
photo Nurito - Beritajakarta.id

Pondok Kopi Railway Crossing Is Closed

After passing through a long socialization a week ago, the Pondok Kopi railway crossings in Duren Sawit, East Jakarta is finally closed. It is only a trial that has been done since last Friday night.

It's just trial, we will do this until May 19. But it will be done permanently on May 23

East Jakarta Transportation Sub-dept. Traffic Section Head, Andreas Eman said Pondok Kopi railway crossing is closed, as it is the program of Transportation Ministry, which aims to improve safety and comfort for motorists, especially there will also be a double track at the crossing.

Damaged Road on the Railway Crossing of Jalan Sukabumi Repaired

"It's just trial, we will do this until May 19. But it will be done permanently on May 23. It also aims to minimize traffic accident," he expressed, Saturday (4/29).

Such railway crossing is using movable concrete barrier (MCB). While to parse traffic jam, a number of Transportation Sub-dept. officers have been dispatched to the field.

For the vehicles, those will be rerouted to flyover above.

Vehicles coming from Jalan I Gusti Ngurah Rai towards Jalan Raya Penggilingan or Jalan Soemarno, will be rerouted to flyover.

Otherwise, vehicles coming from Jalan Soemarno or Jalan Penggilingan toward Jalan I Gusti Ngurah Rai must pass through flyover. It also applies to those who want to go to Klender Baru Station or Bintara Toll Gate and its surrounding areas, must spin first through Buaran U-turn.

Linked News
Popular News indeks
  1. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye837 personTiyo Surya Sakti
  2. E. Jakarta PMI Distributes Assistance to Strong Wind Survivors

    access_time12-11-2024 remove_red_eye474 personNurito
  3. Acting Governor Teguh Inaugurates Marullah Matali as Regional Secretary

    access_time08-11-2024 remove_red_eye386 personFolmer
  4. Commission B Legislator Wants Link and Match Program to Be Intensified

    access_time09-11-2024 remove_red_eye379 personDessy Suciati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye371 personTP Moan Simanjuntak