You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Diuji Coba Dari Stasiun Velodrome ke Stasiun Boulevard

LRT Trialled from Velodrome Station towards Kelapa Gading

This trial is done twice in a day, precisely first trip at 3-4 PM and second trip at 4-5 PM

PT Light Rail Transit (LRT) Jakarta today is conducting an operation trial of four LRT train cars. Operation trial is carried out from the Velodrome station to the North Boulevard station.

Jakarta LRT Train Tested Operating

Besides him, there were also PT Jakarta Propertindo (Jakpro) President Director, Dwi Wahyu Darwoto; President Director of PT LRT Jakarta, Allan Tandiono; and Head of Jakarta Transportation Dept., Andri Yansyah.

"This trial is conducted to ensure the train is running well and of course on time," expressed Allan Tandiono, President Director of PT LRT Jakarta, Wednesday (9/12).

He explained that the limited trial time from Rawamangun Velodrome station to Kelapa Gading LRT station is in accordance with the trip time planning, which is 12 minutes.

Similarly, central operational control has been running well.

"The train runs at a speed of 15 kilometers per hour when turning and speed of 40 kilometers per hour when running straight," he stated.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2633 personNurito
  2. Closure of Railway Level Crossings Socialized

    access_time13-05-2026 remove_red_eye2354 personTiyo Surya Sakti
  3. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye975 personFolmer
  4. Waste Sorting Movement Boosts Circular Economy

    access_time12-05-2026 remove_red_eye836 personFakhrizal Fakhri
  5. Fire Burns Five Houses in Cengkareng Extinguished

    access_time12-05-2026 remove_red_eye734 personBudhi Firmansyah Surapati