You don't have javascript enabled. Good luck with that.
Pencarian
 Jalan Rasuna Said Diterapkan Ujicoba ERP

Jalan Rasuna Said, Next Target of ERP Trial

Construction of an ERP gate foundation has been completed. And its equipment is still being tested

After being tested on Jalan Jenderal Sudirman a while ago, the Jakarta Transportation Department is going to re-test out the system of Electronic Road Pricing (ERP) on Jalan Rasuna Said, Kuningan, at the end of this month.

Head of Jakarta Transportation Department, Muhammad Akbar said it is the same with trial on Jalan Jenderal Sudirman, the next trial in Kuningan will also use one gate to record the passing vehicles. "Construction of an ERP gate foundation has been completed. And its equipment is still being tested," said Akbar, Thursday (9/4).

Free Double-decker Buses Prepared for ERP Lanes

The trial in Kuningan will also involve 100 cars that would be installed with On Board Unit (OBU).

He admitted that ERP trial on Jalan Rasuna Said is similar with ERP trial on Jalan Jenderal Sudirman. This is because its trial is only done to test out the equipment and search for the right location.

In trial phase, three sets of machine are installed to detect OBU located in the slow lane of Jalan Rasuna Said. In the ERP gate, there is a OBU reader equipment and three vehicle detection machines as well as cameras.

Those three machines consist of VDC Passage (a sensor to detect the type of vehicle), VR sensor (a camera that can take pictures of vehicle's license plates) and transceivers (data receiver from OBU).

ERP implementation is planned to be done in 2016 using the same mechanism as three-in-one lane. Later on, it will apply on Monday-Friday at 7-10 AM and 4-7 PM.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1590 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1440 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1304 personFolmer
  4. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye967 personDessy Suciati
  5. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye845 personAldi Geri Lumban Tobing