You don't have javascript enabled. Good luck with that.
Pencarian
Rekayasa Lalin Diberlakukan di Jalan RE Martadinata
.
photo Suparni - Beritajakarta.id

Traffic Engineering Applied on Jalan RE Martadinata

Jakarta Transportation Agency (Dishub) applied traffic engineering on Jalan RE Martadinata, Pademangan, North Jakarta due to construction of Ancol Sentiong Pump House.

This traffic engineering is valid from September 9, 2021 until the end of December

North Jakarta Transportation Sub-agency Head, Harlem Simanjuntak stated, in this traffic engineering, vehicles from Jalan Lodan Raya and Jalan Gunung Sahari that lead to Tanjung Priok are diverted.

Vehicles from Jalan Lodan Raya and Jalan Gunung Sahari that lead to Tanjung Priok or Kemayoran are diverted to Jalan Ancol Timur through Ketel Bridge or Ancol Steam Power Plant (PLTU) and returned to Jalan RE. Martadinata.

39 PKL in KBT Area Disbanded After Exceeding Operating Time Limit

"Traffic flow for vehicles from Tanjung Priok that lead to Gunung Sahari or Jalan Lodan Raya is still normal. This traffic engineering is valid from September 9, 2021 until the end of December," he said, Friday (9/10).

He appealed motorists to avoid roads around the location and look for alternative routes to avoid congestion.

"We deploy at least two personnel on the field in collaboration with Polantas to help regulate the traffic and direct the motorists," he mentioned.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye777 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye476 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye374 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye331 personTP Moan Simanjuntak