You don't have javascript enabled. Good luck with that.
Pencarian
Tiga Kebon Bibit Suplai Tanaman ke Kolong Tol Becakayu

Three Seed Gardens Supply Plants Under Becakayu Toll Road

The East Jakarta Parks and City Forest Sub-agency has prepared three seed gardens supply plants to be planted in the area under the Becakayu Toll Road, which is approximately eight kilometers long.

Every day, we produce at least 100 seeds of ornamental plant

East Jakarta Parks and City Forest Sub-agency Head, Djauhar Arifin said the three seeds prepared for the production of various types of plants were from Taman Pulo Indah Seed Garden (TPI), Pulogebang Seed Garden, Cakung, Kampung Dukuh, Kramat Jati, and Malaka I TPU, Duren Sawit.

"Every day, we produce at least 100 seeds of ornamental plant types Pilo Kuning, Hanjuang Kribo, Gandarusa Merah and Putih," he said, Thursday (1/12).

Government Intensifies City Planning for Sustainable Jakarta

He explained that the production of this ornamental plant nursery involved dozens of PJLP workers in the infrastructure section. They were from Taman Pulo Indah (10 workers), Kampung Dukuh (eight workers), and TPU Malaka I (five workers).

"The results of this nursery are distributed to embroider greenery in green lanes and parks throughout the East Jakarta area," he added.

Last year, he claimed to have succeeded in producing more than 50,000 ornamental plant seeds. The nursery model was done by cuttings and put in polybags.

As for the information, the seeds of this plant have been planted in the area under the Becakayu toll road, several green belts and parks in East Jakarta, as well as other points.

Linked News
Popular News indeks
  1. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1031 personNurito
  2. Jakarta KPU Records More Than 8.2 Million Registered Voters

    access_time06-07-2026 remove_red_eye955 personFolmer
  3. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye910 personDessy Suciati
  4. MRT Phase 2A Northbound Tunnel Excavation Completed

    access_time09-07-2026 remove_red_eye730 personAldi Geri Lumban Tobing
  5. Addressing Collapsed Road in Pulo Gadung is a Priority, Pramono Says

    access_time08-07-2026 remove_red_eye694 personDessy Suciati