You don't have javascript enabled. Good luck with that.
Pencarian
 Pulau Seribu Kekurangan Mesin Pengolah Sampah
.
photo istimewa - Beritajakarta.id

Many Garbage Processing Machines in Kepulauan Seribu Damaged

Due to only 3 of 11 waste processing machine are functioning in Kepulauan Seribu, the trash seen piling up and need a serious treatment immediately.

If there is an incinerator machine, the trash will no longer accumulate. The trash won't also thrown into the sea because it is not allowed

"The local people were forced to thrown the trash in the back of the island because many of waste processing machine were damaged, such as in the Untung Jawa Island and Pramuka Island," said Kepulauan Seribu Regent, Tri Djoko Sri Margianto, Monday (4/ 6).

According to him, his side had coordinated with Cleanliness Sub-Department to repair the waste processing machine. While one of the garbage-burning machine which is still functioning is located on the Pari Island.

Water Channel on Jalan Kapuk Raya Needs Normalization

"If there is an incinerator machine, the trash will no longer accumulate. The trash won't also thrown into the sea because it is not allowed," he said.

Besides the damaged machine, Kepulauan Seribu also overwhelmed with the amount of garbage in the sea. The trash came from waters in Jakarta that carries through to the island. While waiting for Sub Health to repair the garbage processing machines, his side also doing the handling and distribute the authority between the Sub-Health and urban villages. Moreover, his side planned to install trash can every 10 meters on each island, so the local do not need to accumulate the trash again.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye347 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik