You don't have javascript enabled. Good luck with that.
Pencarian
Lima Sumur Resapan Dibangun di MIN 12 Cibubur

Five Infiltration Wells Built in MIN 12 Cibubur Yard

The Cibubur Uran Village, Ciracas, East Jakarta, built five infiltration wells in the yard of the State Elementary School (MIN) 12, Jalan Abdurrahman Blok Dukuh, RT 02/10.

They are built with a depth of 15 to 20 meters

Cibubur Urban Village's Economy and Development Section Head, Heru Kristianto stated the five infiltration wells were built by nine PPSU personnel with the help of a borrowed drilling machine from the Ciracas Sub-district Water Resources (SDA) Unit.

"It has been ongoing since mid-August and is targeted for completion next week," he expressed, Tuesday (9/10).

Joint Personnel Construct Infiltration Well in Cipinang

It was carried out to meet the target of 40 infiltration wells by the end of December.

Of the 40 wells, wells were built already at 17 points. Four points each in the urban village office yard, four points on the left and right sides of Jalan Raya Jamboree, near Cibubur Triangle Park.

Then two points in Phb Complex RW 10, two points in RW 06, and five points in the MIN 12 Cibubur yard.

"They are built with a depth of 15 to 20 meters," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1794 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1023 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye1007 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye848 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye780 personDessy Suciati