You don't have javascript enabled. Good luck with that.
Pencarian
Lima Sumur Resapan Dibangun di MIN 12 Cibubur
....
photo Istimewa - Beritajakarta.id

Five Infiltration Wells Built in MIN 12 Cibubur Yard

The Cibubur Uran Village, Ciracas, East Jakarta, built five infiltration wells in the yard of the State Elementary School (MIN) 12, Jalan Abdurrahman Blok Dukuh, RT 02/10.

They are built with a depth of 15 to 20 meters

Cibubur Urban Village's Economy and Development Section Head, Heru Kristianto stated the five infiltration wells were built by nine PPSU personnel with the help of a borrowed drilling machine from the Ciracas Sub-district Water Resources (SDA) Unit.

"It has been ongoing since mid-August and is targeted for completion next week," he expressed, Tuesday (9/10).

Joint Personnel Construct Infiltration Well in Cipinang

It was carried out to meet the target of 40 infiltration wells by the end of December.

Of the 40 wells, wells were built already at 17 points. Four points each in the urban village office yard, four points on the left and right sides of Jalan Raya Jamboree, near Cibubur Triangle Park.

Then two points in Phb Complex RW 10, two points in RW 06, and five points in the MIN 12 Cibubur yard.

"They are built with a depth of 15 to 20 meters," he stated.

Linked News
Popular News indeks
  1. First Day of MBG Program in S. Jakarta Targets 2,972 Students

    access_time13-01-2025 remove_red_eye1187 personTiyo Surya Sakti
  2. Residents Flock to Cheap Bazaar at Cilandak Timur Urban Village Office

    access_time15-01-2025 remove_red_eye749 personTiyo Surya Sakti
  3. City Council Chairman Supports Environmental Agency Manages MBG`s Food Waste

    access_time13-01-2025 remove_red_eye639 personDessy Suciati
  4. Plenary Meeting to Determine the Elected Governor-Vice Governor will Be Held Tomorrow

    access_time13-01-2025 remove_red_eye620 personDessy Suciati
  5. E. Jakarta Administration Builds Outdoor Meeting Point Area

    access_time13-01-2025 remove_red_eye589 personNurito