You don't have javascript enabled. Good luck with that.
Pencarian
 Lahan Bekas Bongkaran Rawa Badung Akan Dijadkan Waduk
.
photo Nurito - Beritajakarta.id

Rawa Badung Reservoir will Be Re-Functioned

After the demolishment towards 85 illegal buildings in Kampung Rawa Badung, RT 10 and 14/08, Jatinegara Urban Village, East Jakarta, completed, the land will be dredged to be re-functioned as a reservoir. 

The land is dredged immediately to construct the reservoir

The reservoir which has 1.8 hectares land area is expected could minimize flood impact on Jalan KRT Radjiman and its surrounding area. 

Head of East Jakarta Water Management Sub-Department, Ahmad Yazied Bustomi disclosed formerly, the reservoir had 4.4 hectares land area. But it split to be 2 parts as there is road construction. On east side is 1.8 hectares located at RT 10 and 14/08. While on the west side is 2.6 hectares located at RW 10 and 08. 

85 Buildings in Rawa Badung Dam Torn Down, No Compensation

"The land is dredged immediately to construct the reservoir. The depth is about 6 meters and a park will be built around it to make it looks beautiful," said Bustomi, Thursday (8/6). 

It is targeted would be complete by the end of November and spend Rp 9.9 billion. If it is still lacking, it will use 2015 unpredicted funds. 

Besides dredging, a box culvert under Jalan KRT Radjiman would also be repaired. It connects to the reservoir on the east and west side of the road. All this time, the reservoir is damaged as illegal buildings on the east side. Actually, a part of them were burnt in 2013, but the owners re-built their building.

Linked News
Popular News indeks
  1. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye570 personFolmer
  2. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye512 personDessy Suciati
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye424 personAldi Geri Lumban Tobing
  4. City Submits 2024 Financial Report to BPK

    access_time26-03-2025 remove_red_eye356 personBudhi Firmansyah Surapati
  5. Residents Hope Another Free Homecoming Program Held Next Year

    access_time27-03-2025 remove_red_eye311 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik