You don't have javascript enabled. Good luck with that.
Pencarian
Ini Waktu Operasional MRT Mulai Hari Ini

Update! Here is MRT Operational Schedule Starting Today

The operator limits the number of passengers to 70 percent of normal capacity

PT MRT Jakarta has announced changes in the operational schedule during the micro-scale public activity restrictions (PPKM Mikro).

According to William Sabandar, President Director of PT MRT Jakarta, starting today until Friday, the MRT train would operate at 5 AM to 9:30 PM and Saturday - Sunday (weekend) at 6 AM to 9 PM.

MRT Jakarta Pursues Seamless Public Transit Integration in Lebak Bulus

"The operator limits the number of passengers to 70 percent of normal capacity," he expressed, Monday (5/24).

He explained the headway time between stations on weekdays was every five minutes at peak hours or at 7 AM to 9 AM and 5 PM to 7 PM. As for the outside of peak hours, weekends, and headway holidays was every 10 minutes.

It was a follow-up to the Jakarta Transportation Agency (Dishub) Decree number 196/2021 on the Extension of Technical Guidelines for Limiting Transport Capacity and Operational Time for Internal Transportation Facilities amid PPKM Mikro.

"We call on commuters to be disciplined in implementing health protocols in MRT area, such as wearing a mask, maintaining social distancing, washing hands, and not speaking, either one or two directions while on the train and the station platform area," he asserted.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1700 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1476 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1333 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1117 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye810 personDessy Suciati