You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Jalan H Agus Salim Capai 80 Persen
....
photo Wuri Setyaningsih - Beritajakarta.id

Channel on Jalan H Agus Salim Being Normalized

The channel normalization work on Jalan H Agus Salim, Gondangdia, Menteng, Central Jakarta has reached 80 percent.

The normalization is carried out up to 40 meters of channel

Central Jakarta Water Resources (SDA) Sub-agency Acting Governor, Adrian Mara Maulana said the normalization was carried out, because the channel was old.

"The normalization is carried out up to 40 meters of channel," he expressed, Sunday (10/29).

SDA Agency Builds New Sheet Pile in Munjul Reservoir Area

It had been ongoing since October 13 and involved 17 personnel. It was targeted for completion on November 2, 2023.

"We send one excavator unit to replace the u-ditch with dimensions of 80 centimeters," he explained.

Thus far, it has entered the hearth stage or reached 80 percent.

"Hopefully, the channel can maximally accommodate water in the rainy season," he hoped.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye661 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye597 personFolmer
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye437 personAldi Geri Lumban Tobing
  4. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye307 personAldi Geri Lumban Tobing
  5. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye263 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik